Circula Panorama Pipeline Replacement Project
2.28.24 Project Map_Circula Panorama.png
What to Expect During Construction:
  • Single lanes of traffic will be required through
    the construction zones. This will cause delays for
    some residents. Please plan ahead, leave early
    and allow extra time to reach your destination.

  • Pedestrian access will be available

  • Scheduled water service interruptions with 72 hour notice to allow for pipeline tie-ins and service reconnects

  • Increased traffic

  • Noise, dust and vibrations

  • Temporary parking restrictions in construction zone

  • Access to driveways will remain available. Prior notice will be provided if access will be restricted.

Construction Schedule:

East Orange County Water District (EOCWD) completed a water system improvement project in November 2024.  Affected streets included Circula Panorama, Fairhaven Extension, and Panorama View. 

​

Project Benefits:
  • Replaces 3,200 feet of aging pipe.

  • Upsizes pipe from 6" to 12" pipe.

  • Installs three (3) pressure reducing stations.

  • Improves water supply reliability.

Why is the Project Needed?
  • Replaces 40-70 year old pipes.

  • Provides secondary supply pipeline to Panorama Heights.

  • Improves both water flow and pressure for homes near the project area.

How to Stay Informed:

Contact Operations Manager, Jerry Mendzer at 714-538-5815